|
NDWPCC Storm Water Conference
Storm Water Program Coordinator:
|
Dallas Grossman
E-mail
Phone:
701.328.5242
Lucille Herrick
E-mail
Phone:
701.328.5239
Fax: 701.328.5200 |
Mail:
North Dakota Department of Health
Division of Water Quality
918 East Divide Avenue, 4th Floor
Bismarck, ND 58501-1947 |
2011 NDWPCC Stormwater Workshop
Below are the review criteria and example stormwater pollution
prevention plans (SWPPP) used during the table top exercise.
Please note the plans are intended to be used with the criteria plan
review and may not represent a complete SWPPP. A SWPPP is
considered complete when it meets the requirements of the
construction general permit, NDR10-0000.
ND_Criteria_Plan_Review
01_Duluth_Mega
Project
02_LC_Unweave
03_Shoddy Mill
Relocate
04_Maplewood_TH120 Century
05_Moorhead_Hjemkomst Plan
06_Lake Shetek
08_Split Rock
09_Maple
Grove_CSAH30
10_IH94_Black
River Falls
11_USH12_Lake_Delton
12_Hastings Building Removal SWPPP
13_TH60 Faribault
14_Brainerd_Gilbert Lake 018-620-011
16_Grand Portage
17_Paul Bunyon
Trail
18_Elba_Whitewater Bridge
19_Woodbury_Keats
20_Faribault_TH3
21_Gilman_CSAH5_Iowa
22_Afton_St
Marys Bridge
23_SW
Transit_Center
24_Todd Co 11
25_Oahe_SD 1804
26_Beaver Pond
27_Chaska_TS
28_Rochester_TS
29_Eveleth_Mesaba Building_069-090-019
30_Waseca Truck
Station
31_Caladonia Truck Station
32_Lake City
Concourse_R2
33_Fairfield_Chippewa
35_Aitkin ADA
37_Goodwill Building Removal
38_Hastings Building Remova1
39_Mandan_SS-1-094
40_Long Lake_Luce Line Landscape
41_Grand
Fork_SIM-S-BRI-6-029
42_Miller Creek Landscape
43_Mankato_Bike Bridge
44_Geske_SERFO-3-020
45_McKenzie_SS-5-016
46_Ashley_SER-2-003
47_Drayton Bridge
DISCLAIMER
Last Updated:
|